Our projects demonstrate our skills in achieving sustainable, cost effective and quality solutions for each client we have worked with. We understand the importance of meeting target dates and agreed objectives. With the capacity to upscale quickly, we have the ability to manage venue and facility installations for government and education projects as well as catering for independent theatres with modest budgets. Our client focus and quality assurance regardless of the context enables us to deliver the best possible outcomes and higher returns on project investment.
PROJECTS
We were fully involved in the the refurbishment of Tierney Hall & The Purton Building- from the initial consultancy & Design through to complete lighting, audio and curtain installations. Features included a fully automated Crestron System, Digital Audio Signal Processing, Martin Audio FOH Speaker System, All staging curtains and tracks, Talk-back & CTV Infrastructure & Lighting control & fixtures.
A part of the refurbishment of the original early-century cinema, our sewing and install team created a spectacular range of velvet drapes with swag detail on the walls.
The traditional hall at Albany Creek SS has developed into a contemporary space thanks to our team. The original stage has been transformed with a comprehensive Crestron system that is capable of being utilised by the school community. Touch screens will facilitate audio-visual controls and motorised projection screens, dual HD projectors and sound reinforcement will enhance the entire experience for students and parents alike.
Asked to develop a multi-zone system that would include paging and recall, our team devised and installed a Crestron system that would enable control via mobile technology. Our integrated audio system allows the ABC and QSO to manage resources centrally or remotely on the network.
The Brisbane Powerhouse decided to install a MLA compact system after considerable detailed assessment of the space. By utilising the advanced Martin Display software we installed, operators can now deliver any sound mix throughout the venue with accuracy and consistency.
From Concept to Reality - this project involved our team as consultants and then as suppliers & installers of the audio & communications systems, stage lighting systems and infrastructure including their integration with other systems such as AV, house & backstage lighting, curtains, design and development of control positions, on-stage access & egress. The main hall has become a focal point for community events.
A long-term client, we have provided a number of installations for the university, including the TV Studio at Southbank. The latest project was the supply and installation of lighting, audio and curtains for the Burke Street Dance Studios.
As well as a complete upgrade of the electrical and lighting infrastructures, our team provided consultancy & design. The result? Wired lighting bars;144-channels of 1:1 dimming utilising six 24-channel 3kw LSC EKO dimmers with RCBOs & LSC Trupower switching capabilities; Testing and installation of Houston software; installation of DMX and data system; construction of dimmer mounting wall framework; supply and Install Grand MA control console and remote control panels for the LSC & Training.
New audio, lighting and A/V systems transformed this school hall into a great performance space. The quick PA system has enabled the school to meet everyday objectives, while the Led lighting and staging will ensure student work is professionally presented.
Easily retractable, our curtain system is adaptable and aesthetically pleasing. The wool drapes create an excellent backdrop and fabric provides first-rate acoustic properties.
Our installation of Ampetronic induction loop systems used Ultra Low Spill phased array loop designs to improve sound quality for the hearing-impaired.
This project's outcomes included replacement of dimmers in the QAG; successful upgrade to the dmx lighting system and full wireless operation; lighting installation into GOMA cinemas; zero interruption to Gallery operations; zero failures or issues with the new install in over 10 months since completion; successful training outcomes for the technical staff.