Caloundra Civic Centre

As well as a complete upgrade of the electrical and lighting infrastructures, our team provided consultancy & design. The result? Wired lighting bars;144-channels of 1:1 dimming utilising six 24-channel 3kw LSC EKO dimmers with RCBOs & LSC Trupower switching capabilities; Testing and installation of Houston software; installation of DMX and data system; construction of dimmer mounting wall framework; supply and Install Grand MA control console and remote control panels for the LSC & Training.